Septic for new homes, timed to the build

Tell us when you are pouring and when you want to move in. We plan the system around the house and the county review.

On a new build, the septic system is one more trade that has to land on schedule. Plan for it early, before the slab is poured and before the driveway and the electrical service are set, because those decide where the tanks and the field can go.

What we need from you or your builder

  • The property location and a survey or plat if you have one.
  • The house plan with bedroom count and living area.
  • Where the well, water line, barn, shop or pond is or will be.
  • Your target date for moving in.

Our part

We arrange the site and soil evaluation by a licensed evaluator, get the system designed to that report, and file the application with Erath County. Standard systems can be planned by the installer. Aerobic and other non-standard designs are prepared by a professional engineer or registered sanitarian, and we coordinate that.

Once the county issues the authorization to construct, we set the tanks, build the field or spray area and tie in the house. The county inspects the system before it is covered, then issues the notice of approval.

Timing

Paperwork usually takes longer than digging. Call while you are still choosing a house site on the property. A small move of the house can make the difference between a conventional system and an aerobic one.

Manufactured homes and second houses

A manufactured home going onto family land needs its own permitted system, just like a site-built house. A second home on the same tract may need its own system as well. Ask us before you buy the home or set the pad.